Second layer.
Third layer goes down, with an initial fairing of the second.
The third layer is laid, making sure I'm getting nice tight joints by hand planing each 6" (150 mm) plywood strip for a nice joint. An initial fairing, and then screw the bottom down to chines, keel and frames with #10 x 1 1/4" silicon bronze screws.
Once again sealed with CEPS before finish fairing.
No comments:
Post a Comment